Photo_0_ND.jpg
Photo_1_ND.jpg
Photo_2_ND.jpg
Photo_3_ND.jpg
Photo_4_ND.jpg
Photo_5_ND.jpg

Valley City, ND
Pipe Wrap® Dent Repair

Project Overview

Two dents on a buried horizontal 30" liquid pipeline in Valley City, ND, required reinforcement using the Atlas™ carbon-fiber High Temperature (HT) wrap system. The first dent was 5.8" long x 5.3" wide x 0.1" deep, and the second dent was 7.5" long x 8.4" wide x 0.256" deep at the 12:30 position. The repair was a Class 1 location with a nominal wall thickness of 0.386" and a X70 grade pipe. The pipe's temperature was 94° F and the ambient temperature of the location was 77° F. 

Read the full case study here.

Download PDF

Contact us to speak with one of our engineers.

Contact Us