Arkansas
Vis™ Divide: Horizontal Direction Drilling

Application: Directional Drilling
Project Date: December 2015
Project Overview

Vis Divide was placed onsite using the directional drilling method.  The bore and fiber installation took place over a two week span since the ducts needed to be placed prior to the cable installation. This job consisted of two pulls: a 540' and a 100'. The Vis Divide was coupled at 540' to the 100' section via a standard HDPE coupling.

Results

The Vis Divide placement and cable pull went very well.  Both the client and the contractor were very pleased with the installation process.  By using Vis Divide, the client now has an additional dedicated pathway for future expansion.

 

To view this case study in its entirety, click on the download PDF button on the right.