Arlington National Cemetery: Washington, D.C.
GeoSpray®: Manhole Lining

Background

The US Army Corps of Engineers (USACE) is responsible for the maintenance and operation of utilities at Arlington National Cemetery directly on the banks of the Potomac River in Arlington Va. USACE is currently engaged in a multi-year, multi-phase project to rehabilitate and upgrade the storm water system that handles water and drainage throughout the solemn national landmark. The cemetery has been in operation since 1864, and while the plan for land usage at the site today is very detailed and organized, this has not always been the case. Determining the exact location of sewer assets, and evaluating their condition, is a complex process in planning for rehabilitation. Additionally, because there are on average 25 to 30 funerals and interments each day, during which no construction can be conducted, repair efforts are further complicated.

Rehabilitation Solution

The USACE had originally specified a spiral wound product for a 300 linear ft section of pipe that on the original drawings was round with few complications. Once the pipe was inspected it was determined that there were several junction boxes and other concerns that made a spiral wound solution less desirable. After evaluating alternatives, it was determined that lining with a geopolymer was a good option. USACE changed the specification and allowed for the application of GeoSpray geopolymer mortar for the pipes, junction boxes, and 200 vertical feet of manholes and other structures. USACE had already installed the project with good success in other military applications including a project at Ft Bragg in 2015. Inland Pipe Rehab was awarded a subcontract for pipe bursting, geopolymer pipe lining, and a portion of new construction work during phase II of the project.

Results

The GeoSpray geopolymer lining was installed at night to avoid any disruption to the public or the operations of the cemetary while also adhering to detailed government regulations. Over a 2-week period, all of the pipe lining, manholes and junction boxes that were part of the project phase were completed. Further opportunities for use of GeoSpray with USACE are being evaluated for trenchless rehabilitation of military and other government assets.

Download PDF